Results 1 to 7 of 7
Threaded View
-
16th June 2013 #1
production count is too high at work
We scan documents at work on an ibml scanning machine. One year a go the minimum hourly count was 4000, then it went up to 4500, and now its 5250. I think this is very unfair, because most of the documents are old and in poor condition from the hospitals. The documents come to us in 2cuft boxes and are prepared for scanning by teams of people on site then are stacked on shelves. Us scanning people are fighting for the best quality boxes. The poor quality documents always stop the machine so its next to imposible to get the hourly count and we have all on ocasions been in the office for a telling off.
But this new count of 5250 is too much and ive had enough and need to find out the laws on this subject. Anyone know anything on the laws
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
the count down has begun
By stevewool in forum Loose Talk, Chat and Off TopicReplies: 4Last Post: 1st December 2013, 23:42 -
Jaguar moving some of its production to china
By andy222 in forum News UKReplies: 17Last Post: 3rd November 2012, 15:51 -
Mass Brawl Halts Foxconn Production
By Dedworth in forum News - WorldReplies: 3Last Post: 24th September 2012, 14:27